The duct construction engineering comprises all those activities needed to develop all the workshop drawings and the material lists required for the workshop production of the ducts. After the necessary checks between the duct model and the functional diagrams, the hull and the furniture lay-out have been carried out in order to reduce potential discrepancies and interferences, installation and workshop drawings are made. They will include pieces mark-up and material lists for rectangular and rounded ducts. Related accessory items are listed in dedicated tables.
Dopo aver effettuato i necessari controlli con gli schemi unifilari, lo scafo ed il lay-out d’arredo per ridurre al minimo le possibili incongruenze e/o interferenze, vengono realizzati dei piani di montaggio, comprensivi di marche pezzo, ai quali sono associati i disegni costruttivi di ogni pezzo e l’elenco materiali per le condotte rettangolari e circolari. La componentistica accessoria viene elencata in apposite tabelle.

Contact us